Install Spy Sensors in Walls

  1. Before sheet rock

    1. Install a “capture cylinder”

    2. Mount it to a 2x4

    3. Explain to the contractor and sheet rocker what you are doing

    4. Add the wire

    5. Expect to install about 10 capture cylinders per hour

  2. After sheet rock and mud for flush finish

    1. Clean cylinder with a sheet rock knife or razor

    2. Put flange on spy and splice to wire

    3. After the walk test, insert with a touch of silicon glue

 

 

The two pictures below show typical in-wall installations.